Thread: Uh Oh !

  1. #1

    Default Uh Oh !

    Starbucks has been building a new coffee shop in our town which seemed to be taking a really long time, and 7 Brew Coffee put up what appeared to be a pre-fab shop just a short distance down the street.. They had been working on the Starbucks for what seemed an awfully long time, as the 7 Brew put up their shop in a matter of days after the lot was prepared. It finally came out that the architect, builder, contractor or whom ever forgot to have water run to the building. Shouldn't take a genius to know that you have to have water to brew coffee and flush the toilet.

  2. #2
    Join Date
    Sep 2009
    Location
    Alabama, Gulf Coast Region
    Posts
    10,298

    Default

    I wouldn't think SB would require that much water assuming the flushed toilet water would supply the coffee makers.

  3. #3
    Join Date
    Aug 2009
    Location
    Beach Va, not Va Beach
    Posts
    11,035
    Blog Entries
    5

    Default

    Interesting, they started.to build a Starbucks in Kilmarnock Va about a year ago and have still not finished it, a taco bell was stared a few months later and I has already opened

  4. #4

    Default

    Quote Originally Posted by lyman View Post
    Interesting, they started.to build a Starbucks in Kilmarnock Va about a year ago and have still not finished it, a taco bell was stared a few months later and I has already opened
    That is just about when this one was started.

    One of the first things done on a new building is roughing in the plumbing, so hard to imagine how this could happen unless they have different crews as the construction progresses.

  5. #5
    Join Date
    Aug 2009
    Location
    Beach Va, not Va Beach
    Posts
    11,035
    Blog Entries
    5

    Default

    plumbing, slab and building are up, exterior and interior not finished, nor parking lot paved, at all

  6. #6
    Join Date
    Aug 2009
    Location
    Phoenix AZ area
    Posts
    1,295
    Blog Entries
    1

    Default

    Owner missed progress payment, failed a code inspection, permit problems, owner tied up in litigation over ??......

  7. #7

    Default

    It is being built in a mall parking lot, and no dirt work other than removing blacktop for slab and trenching for plumbing was needed. Local regulations wouldn't allow construction to start without proper permitting. Wouldn't think it could already be in litigation if the job was waiting on plumbing to be installed so slab could be poured. The building is now finished, but apparently no water.

  8. #8
    Join Date
    Sep 2009
    Location
    Alabama, Gulf Coast Region
    Posts
    10,298

    Default

    Quote Originally Posted by Johnny P View Post
    The building is now finished, but apparently no water.
    You'd think they might learn something from this.