I promised my wife that we could get this done before winter sets in. I think that we'll be done this week. I'm tired and I'm arthritic in both of my hands and in my spine. However it looks nice and come next Spring, I can start enjoying it longer.
200 tons of gravel, rock and stone. All put into place one stone at a time. I'm tired.
There is an upper patio and pool with a fountain that feeds the waterfall and three pools in the lower patio.
patio 1.jpg
patio 2.jpg